The failures of the aluminum conductor steel reinforced include the aluminum strand entered with water. It is difficult for the aluminum conductor steel reinforced to be entered with water. So far, there is no effective solution. The usual solution is to have an intermediate joint, and then replace the entire aluminum strand.
1. The hazard of the aluminum conductor steel reinforced entered with water
It is sooner or later for the aluminum strand to be damaged after entered with water, which can also lead to the breakdown of aluminum strand. The effective way to deal with this is to focus on prevention. Next, we will introduce how to deal with it.
2. The cause of the aluminum conductor steel reinforced entered with water
(1). When the aluminum strand gets through the pipe, the outer layer of insulation is destroyed and water infiltrates into the aluminum strand.
(2). After the aluminum strand is laid, the two ends of the aluminum conductor steel reinforced is not sealed and exposed to the air for a long time.
(3). The laying and anti-corrosion is not done well, the end sealing is not good, resulting in water entering into the aluminum strand.
(4). It also includes the local breakdown caused by collision and water penetration into the aluminum strand during the operation of the aluminum strand.
3. The treatment method of the aluminum conductor steel reinforced entered with water
(1). After the laying of the aluminum strand, timely prepare the head of the aluminum conductor steel reinforced and complete the wiring, solve the hidden problems from the beginning.
(2). If the aluminum strand is only entered with water at the two end, just cut off both ends and reconnect the cable ends.
(3). If the aluminum strand has an obvious water point, it must cut the aluminum strand near the water point and make an intermediate joint.
(4). If there is water in the aluminum strand trench, try to fix the aluminum strand with a bracket.
(5). Regularly carry out the pressure leakage test on the aluminum strand, so as to keep abreast of the operating status of the aluminum strand.
Nowadays, aluminum conductor steel reinforced is used in many fields. At this time, it is particularly important for customers to choose a professional aluminum conductor steel reinforced manufacturer to provide the product.
扫二维码用手机看
Recommended News
Service Hotline:
E-mail:
Address:
Majiao Industrial Zone, Renqiu City, Hebei Province